Specialty
Noise / Vibration
SECTOR
Energy / Power
TYPE
Permitting / Compliance
CLIENTELE
Quasi-Public/Institutions
TIMESPAN
2010LOCATION
Yarmouth, MA
Project Number:
3235Dennis-Yarmouth High School Wind Turbine
SERVICE:
Noise Analysis for Wind Turbines
DESCRIPTION:
The Dennis-Yarmouth Regional High School (DYRHS) proposes to locate/install a wind turbine on the school grounds, either a Fuhrlander FL1500 with a 65-m hub height or a Fuhrlander FL600 with a 50-m hub height. Three possible locations were studied: near the septic leach field; in a forest between the High School and adjacent elementary school; and near the baseball field in the DYRHS athletic complex.
Tech Environmental performed a community sound assessment for the School District under contract with the Massachusetts Technology Collaborative (now the Massachusetts Clean Energy Center). Baseline sound level monitoring was done over a four-day period at seven locations, including school yards and surrounding residential areas in all directions. A 10-meter meteorological tower was setup and operated simultaneous with the sound level measurements. The Cadna-A acoustic model was applied to predict maximum sound levels in accordance with International Standard ISO 9613-2 for both the cut-in and design wind speed operating conditions. Color-coded decibel contour maps were generated.
Compliance with the Massachusetts Noise Policy and the Town of Yarmouth Zoning By-Law was demonstrated for all project design options, up to 1.5 MW of installed capacity.
Key Points
- The Dennis-Yarmouth Regional High School (DYRHS) proposes to locate/install a wind turbine on school grounds.
- Tech Environmental performed a community sound assessment for the School District that demonstrated compliance with the Massachusetts Noise Policy and the Town of Yarmouth Zoning By-Law.